top of page
.JPG

Extension of Los Marmoles breakwater in the Port of Arrecife, Lanzarote

Contract: OMARSUB SL

Period: 2015-2016

Description: Placement of stone weighing more than 2.5 t with hydraulic grab in protection layer, bottom dumping of stone bigger than 2.5 t in protection layer, regularization of bedding with boulder as pre-levelling and bottom dumping of stone of 100-200 kg. 

.jpg
.jpg
.JPG
.jpg
.JPG
.JPG
.JPG
.png

Socials

  • YouTube

Head Office

Rúa Rosal, 44, Entlo. D, 15570 Narón, A Coruña - España

        +34 981 33 07 16

dragafon@dragafon.net

Contact Us

Thanks for your message!

© 2023 by MCR Construction. Proudly created with Wix.com

banner-kit-digital.png
bottom of page