top of page
Dredging in Puerto Naos, 1st Phase, Lanzarote
Contract: COMSA
Period: 2014
Description: 14,926 m3 of dredging up to the -5.00 m level, in sand with clamshell buckets and in basaltic rock using an amphibious hydraulic hammer, from Naval Segundo vessel and subsequent dredging with hydraulic grab, navigation and bottom dumping in an authorized area
bottom of page