top of page
.jpg

Maintenance dredging, Port of Caleta de Velez, Malaga

Contract: Ayora Ports and Works SL

Period: 2008

Description: sand dredging at the entrance of the port, including dumping and levelling on the beach, and mud dredging in the dock and inside of the port, including dumping in authorized area.

.jpg
.jpg
.jpg
.jpg
.jpg
.jpg
.jpg
.jpg
.jpg
.jpg
.png

Socials

  • YouTube

Head Office

Rúa Rosal, 44, Entlo. D, 15570 Narón, A Coruña - España

        +34 981 33 07 16

dragafon@dragafon.net

Contact Us

Thanks for your message!

© 2023 by MCR Construction. Proudly created with Wix.com

banner-kit-digital.png
bottom of page