top of page
.jpg

Dredging to increase draft in the Aragón and Rioja docks, Tarragona

Contract: FCC Construction.

Period: 2010

Description: Dredging of mud, sludge and stone at the Rioja dock up to 11.00 m depth, and dumping in the Port Control area at a distance of 1.54 NM, and dredging of mud and stones at the Aragon dock up to a depth of 15 m, including dumping at a distance of 1.30 NM. 

.jpg
.jpg
.jpg
.jpg
.jpg
naval segundo tarragona 025.jpg
.jpg
.png

Socials

  • YouTube

Head Office

Rúa Rosal, 44, Entlo. D, 15570 Narón, A Coruña - España

        +34 981 33 07 16

dragafon@dragafon.net

Contact Us

Thanks for your message!

© 2023 by MCR Construction. Proudly created with Wix.com

banner-kit-digital.png
bottom of page